Sunday, April 22, 2007

My Hands Are Sore!!

I'll make it short and sweet (but with lots of photos because things were crazy this week) because i'm really tired.

New plumbing on the lower bathroom ceiling (plumbing for the upstairs bath.)
New drywall in the downstairs bath. You can see the shower fixtures installed.

Filled in spot where the old medicine cabinet was. New pedestal sink plumbing installed.

Replaced floorboards in the upstairs bathroom.

Removed lovely old green vinyl flooring in the kitchen.

Removed flooring - you can see where the small addition/crawlspace is.

Pulled the dishwasher out to remove flooring under there (also did under the fridge and stove.)

Called Harold again to haul a load out (hopefully the last)... goodbye kitchen floor!

New drywall going in the back stairwell.

Underlayment installed in the upstairs bath.

Framed out new wall in the bath that separates the crawlspace. New heating duct installed in the wall.

Framed out the new shower and tub deck. Also installed a decent bit of drywall.

Tub deck framed out. Later put a plywood top on here. It's ready to cut out for the whirlpool tub installation.

Framed out the new shower stall in the downstairs bath (the toilet is removed - that's not where it's going!). You'll note there is no upper wall on the left side because the window prevents it.

PETE helped me move the washer/dryer to the basement. It was a bear but thanks a million! I literally couldn't have done it without you.
Baby due date is now in the 50s. Seems like it was just 71 days away. Holy schmoly!

1 comment:

  1. Anonymous10:59 PM

    I can't believe you did this all in one weekend. No wonder your hands hurt. Kathie

    ReplyDelete