My always reliable helper... Dad, came over and helped me prep, clean and paint the rest of the brick curb around the basement perimeter. After we did that we vacuumed the basement and
Darren from Iowa Paint came over around 9 to put on the first coat of epoxy. It took him about 3 hours and looked excellent. It got pretty toxic down there so we had to shut off the furnace gas and leave the premises after awhile.
While Darren was working on the floor epoxy, Dad and I worked in the laundry room. I busted up much of the existing slab... in effect, turning it into a gravel rubble. I beat all of this flat and we spread out some bonding compound over the surface with a brush. We cut some 2x4' lengths and tapcon screwed them into the existing slab (that's a special screw to be used for concrete.) After these were in, we used the large tub I bought to begin mixing 80lb. bags of 5000psi Quikrete. We poured the W and E walls and got them trowelled off by mid afternoon. I watched lots of basketball after that.
Today (Sunday) we returned to finish the floor (almost.) Darren also showed up and completed the 2nd coat on the floor which went very quickly. He also left me a kit to do the laundry room floor after it cures for a month. And he left me lots of free supplies and painted the front porch as well. He was a great guy and did a lot for us that he didn't need to do. If you ever need paint, painting, supplies, etc... I will always recommend him (Iowa Paint on S. Gilbert St.) Dad and I pulled the lumber formwork and mixed 9 more bags of Quikrete. We poured in the center piece... between the two we did yesterday as well as the small square in front of the wine/beer cellar. All that is left to do is the wine/beer cellar floor once I pull the old shelves out of there. We got everything trowelled off and later, once the concrete set up a bit more, I cut some edging into the slab joints that I will fill with a high grade caulk. Things are looking good down there and we no longer have that crappy old busted up floor. In addition, i believe this will help keep radon out of the basement.
Contractor work should begin later this week. Then things will really be hopping!