Today I spent the day on a couple of tasks.
First off I acid-etched and rinsed 1/2 of the basement floor so that it can be epoxy coated. It took quite awhile and some scrubbing and then a lot of fan time on the wet pavement. I might be able to do some of the epoxy tomorrow. That will wrap along the floor and up the little brick curb and then the walls will be coated with UGL masonry sealant paint. The left side of the basement here will be a play area with a cool kiddie floor and the right side will be an indoor shop. There are other parts of the basement to be done later.

I also worked on the upstairs bathroom and did some demo. It's always fun to run the Sawzall as it makes you feel really man-like. Anyway, I ripped and cut, did some removals and got everything out into the foyer where i'll load it onto a truck and haul it to the dump. Under the old tub I found a poured concrete pad which i broke into bits and removed. Then I cut out the old plumbing and did some flux/solder caps to plug off the water lines until the plumber can get in and put them where we want. It's nice having everything out of the bathroom and being able to visualize things better. In addition, it lets us save money from having the contractor do the demo. The plumber will move the drain towards the outer wall where the shower floor will be and they will move the water over there as well in addition to stubbing it so that it goes upstairs to the new master bath as well. I've included a concept drawing of the types of showers we're going to put in both of the new bathrooms.








Lastly, I did some wood filler patching on the front door where I installed the new handle-set which can be sanded later. I also explored the laundry room floor and discovered it's significantly thinner than the rest of the basement floor (I think it was previously overlayed and thickened) so i've changed my plan for it. I am going to install some makeshift edge forms around the floor drain with some 2x4s and in one other spot and am going to overlay the floor with a yard of concrete which i'll screed and trowel down so it can get an epoxy coat as well. I plan on doing this next weekend. I'll make sure to get lots of good pictures of that.