We have a ton of water in our basement. It's pouring right now and is supposed to all day. I can see it running in the SE corner room. Steamatic is on the way to mitigate... accck.








New drywall in the downstairs bath. You can see the shower fixtures installed.
Filled in spot where the old medicine cabinet was. New pedestal sink plumbing installed.
Replaced floorboards in the upstairs bathroom.
Removed lovely old green vinyl flooring in the kitchen.
Removed flooring - you can see where the small addition/crawlspace is.
Pulled the dishwasher out to remove flooring under there (also did under the fridge and stove.)
Called Harold again to haul a load out (hopefully the last)... goodbye kitchen floor!
New drywall going in the back stairwell.
Underlayment installed in the upstairs bath.
Framed out new wall in the bath that separates the crawlspace. New heating duct installed in the wall.
Framed out the new shower and tub deck. Also installed a decent bit of drywall.
Tub deck framed out. Later put a plywood top on here. It's ready to cut out for the whirlpool tub installation.
Framed out the new shower stall in the downstairs bath (the toilet is removed - that's not where it's going!). You'll note there is no upper wall on the left side because the window prevents it.
- have to wait for the electrican and plumber to finish up so I can get to work. I did, however do lots of stuff around our current house. As I stated in a previous post, there are water problems in the basement. Both the small spare room and the guest bedroom have wet floors. Unfortunately, i finished these rooms many years ago in the Summer not knowing that there were water problems. Upon discovering some rotten drywall and wood - i un-finished the spare room this weekend. I only took the carpet out of the guest room and think I can get away with leaving the drywall in there despite a bit of rotten-ness in the corner.










